Spring top Marquees

  1. Very simple and solid set-up system:
  2. Assemble the big ground frame.
  3. Put in the frame two crossing cables.
  4. Pull the roof sail over the frame
  5. Put 2 legs under the frame
  6. Slide masts underneath the roof.
  7. Put last 2 legs under frame.
  8. Put tension on roof by pulling the 4 small pulleys on corner.
  9. Hang in side walls.
  10. Ready.
   

 

Tubular/Clip Frame Marquees

  1. Lay out poles - all same length
  2. Lay out brackets
  3. Create half roof frame first then raise to attach remaining poles
  4. Danger of bending poles - add short centre poles at this stage for extra
    support
  5. Check orientation of end eaves brackets
  6. Eaves brackets connected to poles
  7. Roof frame completed (should also have centre bars)
  8. Roll out main roof cover alongside roof frame
  9. Drape roof cover over frame
  10. Place legs near each joint bracket
  11. One person per joint bracket to lift one side and insert leg
  12. First half raised
  13. First half completed
  14. Second side raised in same way
  15. Ensure corners are well seated
  16. Fix ground rails at this point
  17. Side panels hooked into top

Enlarged Image of 6m x 12m (20ft x 40ft) Multi-Span Gala Tent

   

 

 

 